Capacity (h) | 0 | 2 | 4 | 6 | 8 |
---|---|---|---|---|---|
Comprehensive operating cost (k$) | 1635.2 | 1312.8 | 1233.8 | 1232.6 | 1224.6 |
Generation cost (k$) | 704.0 | 677.7 | 652.3 | 650.8 | 650.4 |
Start-stop cost (k$) | 75.1 | 50.6 | 25.8 | 25.8 | 25.8 |
Carbon emissions (103ton) | 26.4 | 25.2 | 22.4 | 22.3 | 22.1 |
Shear load (MWh) | 117.4 | 0.0 | 0.0 | 0.0 | 0.0 |
Insufficient reserve (MWh) | 122.3 | 0.0 | 0.0 | 0.0 | 0.0 |
Wind power (MWh) | 923.8 | 948.7 | 948.7 | 948.7 | 948.7 |
Discarded light power (MWh) | 1974.4 | 934.8 | 0.0 | 0.0 | 0.0 |