Parameter type | Value | Parameter type | Value |
---|---|---|---|
Rated generating capacity | 110.00 MW | Solar multiple | 1.50 |
Maximum technical capacity | 115.00 MW | Capacity of the TES | 4.20 h |
Minimum technical output | 35.00 MW | Light-heat conversion efficiency | 80.00% |
Minimum downtime | 2.30 h | Heat storage and release efficiency | 97.80% |
Climbing speed | 85.00 MW/h | Hourly heat storage loss | 0.03% |
Start-up thermal power loss | 60.30 MW | Thermoelectric conversion efficiency | 31.35%-38.53% |