Fig. 2From: Transformer training strategies for forecasting multiple load time seriesArchitecture of the Transformer forecasting model. The input and output dimensions differ for the multivariate model and the local and global models. The shown dimensions refer to the Electricity dataset with 321 clientsBack to article page