Fig. 9From: A hierarchical and modular agent-oriented framework for power systems co-simulationsConfiguration of the Case study 2. The generic “change” block of Fig. 2 has been replaced by the “optimisation” module with PV in red allowing the optimal scheduling of the shiftable appliancesBack to article page