Skip to main content

Table 4 Amount of instances per optimization status for different stages of MILP simulations

From: Solar farm cable layout optimization as a graph problem

Category

Total

Optimal

Feasible

Infeasible

Unknown

MILP (A mixed-integer linear program), one day

 Small

80

79

1

0

0

 Medium

80

16

48

12

4

 Large

80

0

50

5

25

MILP (A mixed-integer linear program), one cable type, 1 day

 Small

0

 Medium

4

0

2

2

 Large

25

14

5

6

MILP, one cable type, additional constraints (Eq. 10)

 Small

0

 Medium

2

0

1

1

 Large

6

0

1

5

  1. The specifications for the experiments are in the main text body