From: Optimal industrial flexibility scheduling based on generic data format
Storage | Max capacity [MWh] | Energy loss [MW/h] \(E_{e,loss}\) | Drain time [hour] \(T_{drain,e}\) | Drain quantity [MW] \(p_{e,t,drain}\) | Connected to |
---|---|---|---|---|---|
Storage 1 | 10 | 0 | [19,21] | 1 | L1, L2 |
[36,38] | 1.2 | ||||
Storage 2 | 10 | 0 | [15,17] | 1.5 | L1, L2 |
[43,45] | 1.1 |