Fig. 4From: Distributed multi-objective scheduling of power consumption for smart buildingsResults of simulations with a varying number of interconnected buildings regarding the maximum load, the electricity costs and the adaptational costs. For each setting, 10 simulations with different controllable buildings have been executed. The shaded area displays the standard deviationBack to article page