From: Potentials of game engines for wind power digital twin development: an investigation of the Unreal Engine
Wind turbine model
Vestas V164
Enercon E126
Total electricity production
2,410,838.142 kWh
1,641,128.283 kWh
Hours for production
89.7%
96.8%
Hours at rated production
5.0%
0.3%
The max wind speed experienced at hub height
18.272 m/s
17.999 m/s