Table 3 Data input baseline scenario

From: Can we benefit from game engines to develop digital twins for planning the deployment of photovoltaics?

Parameter

Value

Azimuth

Slope

20°

PV cell capacity

6.25 W

PV module capacity

6.25 W * 60 cells = 375 W

PV array capacity

375 W * 16 modules = 6000 W

Simulation start

2022-01-01 00:00:00

Simulation end

2023-01-01 00:00:00

Simulation step size

1 min

Simulation speed

10 ms i.e., 10 ms advances the simulation with the given step size in-game

Absolute position on earth

latitude, longitude

Time zone

UTC corresponding to the given latitude and longitude