From: Optimal industrial flexibility scheduling based on generic data format
key figure | Units | L1 | L2 | L3 | L4 |
---|---|---|---|---|---|
Load deviation type | – | Increase | Decrease | Decrease | Decrease |
Power state | MW | [0.5, 1] | [2, 2] | [3, 4] | [0.5, 1.5] |
Validity restrictions | Time | None | None | None | None |
Activation costs | € | 0 | 0 | 0 | 0 |
Holding duration | h | [1, 3] | [1, 2] | [1, 1] | [2, 2] |
Regeneration time | h | 0 | 0 | 0 | 0 |
Usage Number | – | [0, 3] | [0, 2] | [0, 1] | [0, 2] |