Fig. 7From: Design and evaluation of a multi-level reactive power marketTotal economic costs of the reactive power provision (Average total costs: Multi-level market 11401.33 €, RC OptMarket 11302.60 €/h, RC NoMarket 47104.03 €/h)Back to article page