Fig. 4From: Integrated planning of grids and energy conversion units in municipal multi-energy carrier systemsInstalled capacities and operation duration curves of heating units within the entire system. Central heat pumps (HP_c) and central pellet heaters (PH_c) provide base load, central and decentral electric heaters (EH_c and EH, respectively) provide peak loadBack to article page