From: Active participation of industrial enterprises in electricity markets - a generic modeling approach
ES components and input parameters | EMC constraints | |
---|---|---|
PV Plant | Identifier | Â |
 | Rated power (kW) |  |
 | Generation factor |  |
CHP Plant | Identifier | Input electrical and heating power shall remain under provided limits. |
 | Nominal capacity (kW) |  |
 | Electrical power rating (kW) |  |
 | Heating power rating (kW) |  |
 | Electrical power efficiency |  |
 | Heating efficiency |  |
 | Minimum run time (MR) | Dwell time constraints (MR, MO and Ns) shall be respected throughout the optimization horizon. |
 | Minimum off time (MO) |  |
 | No. of switches (Ns) |  |
 | Fuel cost |  |
Battery energy storage (BES) | Identifer | State of charge (SOC) of BES shall remain under defined limits. |
 | Energy capacity (kWH) |  |
 | Maximum charging power (kW) | Charging and discharging power shall not exceed maximum limits. |
 | Maximum discharging power (kW) |  |
 | Minimum SOC | Ramping rates shall be respected between two consecutive charging and discharging events. |
 | Maximum SOC |  |
 | Charging efficiency |  |
 | Discharging efficiency | Both charging and discharging of the BES can not happen at same time |
 | Ramping rate (kW/unit time) |  |