From: Active participation of industrial enterprises in electricity markets - a generic modeling approach
MFS Component and their input parameters | Constraints written in EMC | ||
---|---|---|---|
Resources | Raw Material | Identifier | ∙ Material quantities in unit shall remain between given minimum and maximum limits. |
Initial quantity (units) | |||
Minimum quantity (units) | |||
Storage facility id | |||
Product | Identifier | ||
Initial quantity (units) | ∙ At the end of planning horizon, products of type “Final” shall be produced for the required quantities. | ||
Required production quantity (units) | |||
Type : Intermediate or final | |||
Storage Facility | Identifier | ||
Capacity (units) | |||
Machine | Identifier | ∙ If two or more tasks use same machine, they cannot be executed at same time. | |
Power Rating (kW) | |||
Processing rate (units/hr) | |||
Air demand (m3/time) | |||
Heat demand (kW) | |||
Cooling demand (kW) | ∙ While operation of tasks, their run times and interruption shall be accounted. | ||
Tasks | Identifier | ||
Products task produces | |||
Material task consumes | |||
Machines task use | |||
Type : Interruptible, Uninterruptible, Constant | ∙ Maximum capacities of storage facilities shall be respected. | ||
Minimum ON time | |||
Minimum OFF time | |||
Maximum allowed interruptions | |||
Validity |