Table 1 Modeling parameters and constraints for MFS in the model library.

From: Active participation of industrial enterprises in electricity markets - a generic modeling approach

 

MFS Component and their input parameters

Constraints written in EMC

Resources

Raw Material

Identifier

∙ Material quantities in unit shall remain between given minimum and maximum limits.

  

Initial quantity (units)

 
  

Minimum quantity (units)

 
  

Storage facility id

 
 

Product

Identifier

 
  

Initial quantity (units)

∙ At the end of planning horizon, products of type “Final” shall be produced for the required quantities.

  

Required production quantity (units)

 
  

Type : Intermediate or final

 
 

Storage Facility

Identifier

 
  

Capacity (units)

 
 

Machine

Identifier

∙ If two or more tasks use same machine, they cannot be executed at same time.

  

Power Rating (kW)

 
  

Processing rate (units/hr)

 
  

Air demand (m3/time)

 
  

Heat demand (kW)

 
  

Cooling demand (kW)

∙ While operation of tasks, their run times and interruption shall be accounted.

Tasks

Identifier

 
 

Products task produces

 
 

Material task consumes

 
 

Machines task use

 
 

Type : Interruptible, Uninterruptible, Constant

∙ Maximum capacities of storage facilities shall be respected.

 

Minimum ON time

 
 

Minimum OFF time

 
 

Maximum allowed interruptions

 
 

Validity