From: Comparative study of algorithms for optimized control of industrial energy supply systems
 | DRL A | DRL B | MILP A | MILP B |
---|---|---|---|---|
Energy cost | - 52% | - 6% | - 13% | - 3% |
Switching cost | - 27% | - 30% | 166% | 440% |
Temperature cost | 78% | 682% | - 33% | 293% |
Total cost | 33% | 56% | - 8% | 53% |
Energy | - 50% | 38% | 17% | - 4% |
CO2 emissions | - 43% | 31% | 0% | 3% |