From: Comparative study of algorithms for optimized control of industrial energy supply systems
Parameter | Chosen Value |
---|---|
Forecast horizon | 3 h |
Time step size | 3 min |
Thermal interia | 5-20% |
Solver | CPLEX (Branch and Cut) |
Maximum calculation time | 5 min |
MIP Gap | 0,5% |