Classification | Method | Procedure | |
---|---|---|---|
Direct Control | Max Greedy | Start | Take maximum/minimum load |
02 |  Search the cheapest place for the load | ||
03 |   Calculate consumption – generation | ||
Direct Control | Min Greedy | 04 |   Find lowest result |
05 |  Place the load at this place | ||
End | Take the next load and start again | ||
Transactional Control | MAS with comm. | Start | Select agent and hand over consumption plan |
02 |   Agent places its loads (Max Knapsack) | ||
03 |   Agent commits overall consumption plan | ||
End | Select next agent | ||
Autonomous Control | MAS without comm. | All agents place their loads simultaneously | |
Agents commit individual consumption plans |