Skip to main content

Table 1 Decision variables. Index t: Current time step.

From: Realistic modeling of a combined heat and power plant in the context of mixed integer linear programming

 

No.

Decision variables

Description

Type

Generation

1

\( {P}_t^{available} \)

Actual available electrical output power of the CHP [kW]

C

2

\( {P}_t^{set, elec} \)

Set value for the electrical output power of the CHP [kW]

C

3

\( {P}_t^{thermal} \)

Thermal output power of the CHP [kW]

C

4

\( {\delta}_t^{on} \)

If CHP is in operating mode \( {\delta}_t^{on} \)= 1, else 0

B

5

\( {\delta}_t^{start- up} \)

Start-up process in t: \( {\delta}_t^{start- up} \)= 1, else 0

B

Consumption

6

\( {P}_t^{fuel} \)

Fuel consumption of the CHP [kW]

C

Thermal storage

7

E t

State of charge [kWh]

C

8

\( {Q}_t^{charge} \)

Charging power [kW]

C

9

\( {\dot{Q}}_t^{discharge} \)

Discharging power [kW]

C

  1. (1) Variable type: Continous (C)/ Binary (B)