From: Systematic dynamic assessment for resilient operation of distribution networks
Event type | Elements involved | Action | Characteristics |
---|---|---|---|
Change of topology | Switch MV-BB001 - MV-BB082 | Switch opening | - |
Change of voltage in the transmission system | External grid | Change of parameter Ve (excitation voltage) | From 1.0 to 0.9 p.u. |
Change of power injection | PV units | Active power ramp | From 0% to 100% in 10s |
Wind farms | From 0% to 100% in 60s |